Posted On: June 3rd 2026, 07:17 pm
After ➡️ during ➡️ before
This one had 3 layers of concrete patches/overlay that needed to be removed, the existing concrete ground extensively, patched, waterproofed (suspended slab), and finally an industrial product installed. The end result is why you don’t hire the cheap guy!!