Posted On: March 25th 2024, 03:38 pm
Our amazing Force Demolition field team’s executed perfectly on the total separation by hand, the demolition of the existing 3-story structure with a basement attached to an existing 1-story with a basement structure at a active medical facility.
This project had all the challenges with not only the approx 6’ space between the 3-story structure to demolished and the active 1-story structure to remain. We also were sandwiched between a very heavy traveled roadway and small active alleyway for residents on the backside. Both the existing active medical facility and active roadways of the project had to remain open during demolition.
The existing structure to demolished had to be brought down to existing grade systematically level by level not to overload the basement. This process was to not damage the east, north, and south facing basement walls that is holding existing earth between the two structures as not to compromise the existing 1-story including the active roadways.
As with any project, a lot of planning and preparation goes in to making sure that we can execute these projects safely as planned.
Please keep us in mind for your next project that has the need for our demolition services.
We are your go-to union and certified SBE demolition contractor with an industry-leading EMR of .76.
Have a great day and rest your week friends and colleagues.