Most people think Hoover Dam holds back the Colorado River with sheer weight. It doesn't.

The dam is curved — bulging upstream so the water's push runs along the arc and into the canyon walls instead of fighting the concrete head-on. Like a stone arch overhead, the harder it's pushed, the tighter it locks.

But curing concrete makes its own heat. Poured as a single mass, this 3-million-cubic-yard pour would have needed 125 years to cool, cracking itself apart in the process.

So engineers poured the dam in 215 separate blocks, each threaded with steel pipe — 582 miles of it, more than a round trip from Las Vegas to Los Angeles — and ran ice water through them until the concrete cooled evenly. The pipes were then filled with grout and sealed inside the dam, where they remain today.

Hoover Dam came in more than two years ahead of schedule. Ninety years later, it's still holding back Lake Mead — by borrowing the water's own force.

Sources:
U.S. Bureau of Reclamation — Hoover Dam FAQs
U.S. Bureau of Reclamation — Concrete history essay
National Park Service — Hoover Dam overview
Comments (154)
mikebrigggs 13 days ago
artizimozo 21 days ago
prescottazhistory 21 days ago

prescottazhistory

It's simply a horizontal application of the ancient technology of the Roman Arch.

craniosacral_withlaura 24 days ago

craniosacral_withlaura

s if there is any water left to hold back at the rate data centres are consuming it

buzzsargent 24 days ago

buzzsargent

Interesting show 🍀☕☕

bryanjohn57 25 days ago

bryanjohn57

The line visualations are representative or explanatory of....

robertyoungberg a month ago

robertyoungberg

The true arch to divert to load to the anchor points was first used in Mesopotamia around the 2nd millennium BCE, 3,000 years ago.

cwdavis81 a month ago

cwdavis81

A physics lesson all in its own!!

davidcarterstudio a month ago

davidcarterstudio

Hardly a problem these days, as there’s almost 200 feet less water than it was designed for, and unlikely ever to see a full lake again.

gary_back a month ago

gary_back

Is it true that the concrete will not have fully set until 2030?

kenny23220 a month ago

kenny23220

Did you know this?

kkguy365 a month ago

kkguy365

And of things keep going as they are the damn will become irrelevant as there will be no water to fill/create lake meade

jasonachillesmezilis a month ago

jasonachillesmezilis

this video is legit very cool

jm_fangio_ a month ago

jm_fangio_

And now most of the water is gone

peter.browne50 a month ago

peter.browne50

Pretty much like any other dam ever built then....

Load More

More posts

back to up