Instagram story viewer> @ssiegell> Posts
1.5K
followers
1842
following
POSTS STORIES REELS TAGGED
RA 12h 33m 08.714s, Dec +27° 50′ 42.199′′ 
[A11 LM5-1969] Brandt, 2025
aluminized Kapton® thermal insulation 

From 𝘒𝘢𝘱𝘵𝘰𝘯 
7.24.2025 - 9.20.2025
@ermitage_308
@atlasdocumentation by @ssiegell
4
7 months ago
Download
 by @ssiegell
1
7 months ago
Download
RA 22h 47m 31s, Dec +04° 28′ 12′′, 2024 

aluminized Kapton® thermal insulation
 [A17 LM12-1972]

The gallery will be open for the final day of the show today, Saturday Sept. 20th from 12-3pm.
@ermitage_308 

“From 1968 through 1972, I was the Lead Electrical Technician for Grumman’s Lunar Module support team at Launch Complex-39 at Kennedy Space Center. In this capacity I was responsible for supporting all electrical/avionics operations on the Lunar Module from LM 3 (Apollo 9) through LM 12 (Apollo 17). This included supporting installation of electrical components, removal and replacement of electrical components, subsystem and integrated troubleshooting, testing to include as the LMP and CDR (known during the Space Shuttle era as SCO, Space Craft Operator) support. 

While Apollo 17 was staged for launch on the Launch Pad 39A with LM 12 in the SLA (Spacecraft LM Adapter) the IMU, Inertial Measurement Unit was being replaced due to a problem within the unit. A portion of the mylar blanket (Kapton foil insulating blanket) had to be removed to provide access to the IMU. The accompanied Kapton was to be discarded. Since this was the last Lunar Module to go to the moon, realizing the historical significance of this being the last mission to the moon and the last modification with the removal of Kapton from a soon to be Lunar Module to land on the moon, I saved the sheets that were removed for posterity. They have been in my possession for the past 50 years. “ -MW by @ssiegell
1
a year ago
Download
 by @ssiegell
0
a year ago
Download
@ermitage_308 

RA 02h 18m 34s, Dec –42° 07′ 51′′, 2024
aluminized Kapton® thermal insulation

photo @atlasdocumentation taken in Montreal, Quebec by @ssiegell
0
a year ago
Download
𝘒𝘢𝘱𝘵𝘰𝘯 @ermitage_308
photo @atlasdocumentation by @ssiegell
2
a year ago
Download
@ermitage_308

RA 13h 04m 57s, Dec –36° 11′ 29′′ [A12 LM6-1969] Winkel, 2024
aluminized Kapton® thermal insulation by @ssiegell
0
a year ago
Download
@ermitage_308 
open hours today 12-3pm
8440 St-Laurent #308 

RA 02h 18m 34s, Dec –42° 07′ 51′′, 2024
aluminized Kapton® thermal insulation by @ssiegell
4
a year ago
Download
𝘒𝘢𝘱𝘵𝘰𝘯 is currently on view @ermitage_308 
8440 rue Saint-Laurent #308, Montreal, Quebec H2P2L8, open by appointment taken in Montreal, Quebec by @ssiegell
4
a year ago
Download
Opening next week:

Sam Siegel
𝘒𝘢𝘱𝘵𝘰𝘯

Join us on Thursday July 24th from 5-8pm for the opening reception.

@ssiegell by @ssiegell
1
a year ago
Download
Hope is not —
Stefan Alexandrej Cvitanic
Presented by Vial NSC @mery_gates 

Opening reception
Friday, August 30th, 7pm
1345 Dekalb Ave. 
Brooklyn, NY

On view August 30th - September 7th 
@stefanalexandrejcvitanic
@vialrecordings 
@mery_gates taken in Nova Scotia, Canada by @ssiegell
0
2 years ago
Download
RA 07h 42m 18.65432s, Dec. -12° 55′ 24.9876′′, 2023 
aluminized Kapton® thermal insulation 
[Apollo 12 LM 6-1969] 

@mery_gates 1.13 - 2.11.24 #ausablechasm by @ssiegell
3
3 years ago
Download

Download All

Save the photos and videos currently loaded on this page.

0Photos
0Videos
Ready to download 0 / 0

Keep this tab open until your download is ready.

back to up